Research on depth of earth cover for shield tunnel anti-buoyancy security
Liu Xueyan,Yuan Dajun and Jiang Xi
Strategic Study of CAE 2015, Volume 17, Issue 1, Pages 88-95
The depth of earth cover for tunnel anti-buoyancy security during construction and operation was analyzedThe formula of depth of earth cover for anti-buoyancy security of tunnel during construction was givenThe weight of earth cover for tunnel was suggested to consider as unique factor for tunnel security duringThe eroded depth for design should be considered for tunnel influenced by floods.It has provided some references for longitudinal section design of the tunnel in construction under the
Keywords: anti-buoyancy security; tunnel construction period; tunnel operation period; depth of earth cover
Risk assessment on Bohai Bay subsea tunnel in its operational period
Wang Yonghong,Liu Bing,Zhang Yonggang
Strategic Study of CAE 2013, Volume 15, Issue 12, Pages 107-112
The operation of super-long subsea tunnel is a extremly complex systemThe procedure of risk assessment was explained in detail,and its application on Bohai Bay subsea tunnelFirstly, lots of different risk factors of the subsea tunnel operation were identified systematically, which involved water damage,tunnel lining crack, tunnel freezing,tunnel lining corrosion,tunnel earthquakedisaster,the air pollution inside the cave,tunnel fire and the train derailment accident.
Keywords: subsea tunnel operational period risk analysis risk assessment
Large-scale model test study on the water pressure resistance of construction joints of karst tunnel
Frontiers of Structural and Civil Engineering Pages 1249-1263 doi: 10.1007/s11709-023-0974-x
Keywords: karst tunnel lining construction joint water pressure resistance large-scale model test numerical
Construction risks of Huaying mount tunnel and countermeasures
Haibo YAO, Feng GAO, Shigang YU, Wei DANG
Frontiers of Structural and Civil Engineering 2017, Volume 11, Issue 3, Pages 279-285 doi: 10.1007/s11709-017-0414-x
Keywords: tunnel?construction gas?outburst geology?prediction automatic?monitoring?system
Design and construction technology of underwater tunnel
Wang Mengshu
Strategic Study of CAE 2009, Volume 11, Issue 7, Pages 4-10
Keywords: underwater tunnel design construction
Construction technology of Wuhan Changjiang tunnel―the first tunnel under Changjiang River
Wang Mengshu,Sun Mou,Tan Zhongsheng
Strategic Study of CAE 2009, Volume 11, Issue 7, Pages 11-17
Wuhan Changjiang tunnel is the first tunnel under Changjiang River.The paper introduced the process of design and research of the project, the construction model, the overalldesign and general situation of the construction.
Keywords: Wuhan Changjiang tunnel construction model overall design construction
Zaobao LIU; Yongchen WANG; Long LI; Xingli FANG; Junze WANG
Frontiers of Structural and Civil Engineering 2022, Volume 16, Issue 4, Pages 401-413 doi: 10.1007/s11709-022-0823-3
Keywords: hard rock tunnel tunnel bore machine advance rate prediction temporal convolutional networks softcomputing construction big data
Experiences and Lessons From the Construction of Erlang Shan Tunnel
Zheng Daofang
Strategic Study of CAE 2000, Volume 2, Issue 1, Pages 62-67
Keywords: Erlangshan tunnel construction experiences
The location choice and construction technology of shafts in Bohai Strait tunnel
Wang Yunlong,Tan Zhongsheng
Strategic Study of CAE 2013, Volume 15, Issue 12, Pages 85-89
Keywords: subsea tunnel shaft ventilation construction technology
Wang Kai,Zhang Chengping,Wang Mengshu
Strategic Study of CAE 2012, Volume 14, Issue 1, Pages 90-97
Aiming at the asymmetric double-arch tunnel engineering that lies atJiaozhou Bay in Qingdao, the section located in the intersection between main tunnel and ramb tunnelFour construction schemes are constituted according to different construction sequences and differentIt concludes that the surrounding rock deformation could be better controlled by using of the constructionsequence that first middle drift and then right hole of ramb tunnel, and the reasonable construction
Keywords: subsea tunnel asymmetric double arch tunnel construction scheme optimization construction sequence
Study on the Goals and Key Tasks of Eco-Civilization Construction in the 13th Five-Year Plan Period
Shu Jianmin,Zhang Linbo,Luo Shanghua,Du Jiaqiang and Liang Guanglin
Strategic Study of CAE 2015, Volume 17, Issue 8, Pages 39-45
The 13th Five-Year Plan period is crucial for China to accelerate eco-civilizationconstruction and to complete the construction of the moderately prosperous society.Based on the judgment of eight key challenges faced by eco-civilization construction, this paper proposesthe goal and obligatory targets of eco-civilization in the 13th Five-Year Plan period, and also proposesand resource to build environment-friendly and resource-efficient society, implementing ecological construction
Keywords: eco-civilization construction 13th Five-Year Plan period key tasks policy recommendations
Grouting construction technology of high pressure and rich water fault F11 in Qiyueshan Tunnel
Zhuo Yue,Sun Guoqing
Strategic Study of CAE 2009, Volume 11, Issue 12, Pages 82-86
Karst caves and faults are big challenges in tunnel construction.Water gushing happens in these strata frequently, which affects construction schedule and constructionQiyueshan Tunnel on Yichang-Wanzhou Railway crosses underground rivers, karst caves and fractured faultspressure, large volume of water gushing and complicated geological condition, is the key of the whole tunnelscheme, new construction technology and new effect examination method for water control and rock collapse
Keywords: Qiyueshan Tunnel fractured fault technical challenges new construction scheme new construction technology
Preliminary conclusions of construction technology in Xiamen Xiang’an subsea tunnel
Qu Shouxin
Strategic Study of CAE 2009, Volume 11, Issue 7, Pages 24-29
A comparison of the bridge programs and the tunnel programs for the projectAnd there is a preliminary and brief conclusion for the construction of the Chinese first subsea tunnel, which contains the characteristics and difficulties and disadvantages of the construction.
Keywords: Xiamen Xiang’an subsea tunnel construction technology preliminary conclusions of experience
Key technology of design and construction on immersed tube tunnel
Du Chaowei,Wang Xiuying
Strategic Study of CAE 2009, Volume 11, Issue 7, Pages 76-80
Combined with the built immersed tube tunnel, comparison and selection
Keywords: immersed tube tunnel scheme comparison waterproof design construction technology
Study on construction technique of large section sub-sea tunnel crossing the weak stratum
Huang Mingli,Lu Wei,Xu Hengguo,Tan Zhongsheng
Strategic Study of CAE 2009, Volume 11, Issue 7, Pages 35-38
Xiang'an sub-sea tunnel is the first large section sub-sea tunnelstabilizing capacity of the surrounding rocks, water inrush is the maximal risk during the sub-sea tunnelconstruction.In this paper, based on analyzing the excavation method of the tunnel and results of on site monitoringwhen crossing the weak stratum with abundant water, and offer technological support for construction
Keywords: Xiamen Xiang’an sub-sea tunnel weak stratum construction technique
Title Author Date Type Operation
Research on depth of earth cover for shield tunnel anti-buoyancy security
Liu Xueyan,Yuan Dajun and Jiang Xi
Journal Article
Risk assessment on Bohai Bay subsea tunnel in its operational period
Wang Yonghong,Liu Bing,Zhang Yonggang
Journal Article
Large-scale model test study on the water pressure resistance of construction joints of karst tunnel
Journal Article
Construction risks of Huaying mount tunnel and countermeasures
Haibo YAO, Feng GAO, Shigang YU, Wei DANG
Journal Article
Construction technology of Wuhan Changjiang tunnel―the first tunnel under Changjiang River
Wang Mengshu,Sun Mou,Tan Zhongsheng
Journal Article
Realtime prediction of hard rock TBM advance rate using temporal convolutional network (TCN) with tunnelconstruction big data
Zaobao LIU; Yongchen WANG; Long LI; Xingli FANG; Junze WANG
Journal Article
The location choice and construction technology of shafts in Bohai Strait tunnel
Wang Yunlong,Tan Zhongsheng
Journal Article
Research on construction optimization of asymmetric double arch section in Jiaozhou Bay Subsea Tunnel
Wang Kai,Zhang Chengping,Wang Mengshu
Journal Article
Study on the Goals and Key Tasks of Eco-Civilization Construction in the 13th Five-Year Plan Period
Shu Jianmin,Zhang Linbo,Luo Shanghua,Du Jiaqiang and Liang Guanglin
Journal Article
Grouting construction technology of high pressure and rich water fault F11 in Qiyueshan Tunnel
Zhuo Yue,Sun Guoqing
Journal Article
Preliminary conclusions of construction technology in Xiamen Xiang’an subsea tunnel
Qu Shouxin
Journal Article
Key technology of design and construction on immersed tube tunnel
Du Chaowei,Wang Xiuying
Journal Article